As part of the Governor’s Office of Storm Recovery (GOSR) citywide program to build resilience in waterfront neighborhoods, WSP was contracted by Dormitory Authority of the State of New York (DASNY) to identify and design stormwater management and drainage solutions for three areas within the BPC. The projects were designed to concurrently address community recreational needs and integrate the solutions within the community landscape.
WSP developed master plans for each project location, which depicted the optimal reconfigurations of recreation elements integrated with stormwater management elements that would manage the greatest storm event given the available funding. Multiple configurations were modeled, and cost estimates developed, until the optimal balance was achieved.