This regeneration project seizes a rare opportunity to create a new town centre in central London – overcoming some very complicated structural and geotechnical challenges.

img-long-elephant-and-castle-town-center (1)
London is always growing, and there are not many undeveloped town centre sites left in zone one. This is a project like no other, in the opportunity it brings and the sheer mix of uses.
img-elephant-and-castle-town-center
New homes
983
PROJECTED EMBODIED CARBON SAVED (TONNES)
2,500
Site area (gross, sqm)
196,836
img-elephant-and-castle-town-center (2)
img-elephant-and-castle-town-center (5)
What makes Elephant & Castle Town Centre stand out
icn-future-ready

Future Ready

Development includes a new ticket hall for two London Underground lines beneath the site

  • Super-deep five-storey basement also has capacity to become an interchange for future expansion of the Bakerloo Line

icn-WMAP-Conserving-precious-resources

Reusing materials

WSP’s algorithmic design tool maximizes use of reclaimed steel components

  • 20% of reclaimed steel will be used across the development, projected to save around 125 tonnes of embodied carbon

icn-efficient-integrated-delivery

Digital design

Pedestrian modelling was used to optimize access and public transport routes through live construction site 

  • Geotechnical modelling ensures critical below-ground infrastructure remains unaffected by works