Power Upgrade at Bolo Point | Japan
When the Bolo Point power and distribution systems required an upgrade, Louis Berger engineered, furnished and installed standby electrical power systems.
Client
- U.S. Army Corps of Engineers
Project Value
- Project value
Project Status
- Project status