A major, three-part redevelopment is transforming this hospital in the Swedish city of Linköping into a modern, green and flexible facility, capable of adapting to emerging technologies in the decades ahead.
The first phase, completed in 2015, has added around 66,000 square meters to the hospital’s east and west wings in an energy-efficient expansion designed to keep power consumption below 60 kWh per square meter and minimize the lifecycle cost of key systems and products. The building is lined up for a silver rating under Sweden’s Miljöbyggnad environmental classification system.